Colorado Aquatic Center at Zebulon building rendering and competition pool
Conceptual rendering and reference photo
"Douglas County Names CAFas Aquatics Development Partner"

Help Build Douglas County's
First 50-Meter
Aquatic Center

Colorado Aquatics Foundation is raising $3.2 million by October 31, 2026 to advance the Colorado Aquatic Center within the current Zebulon development window. Phase 1 moves steel acquisition, design and permitting forward.

Phase 1 Goal$3.2 Million by October 31, 2026Donate to Phase 1

Colorado Aquatics Foundation, Inc. · A Colorado 501(c)(3), est. 2023

CAF Leads Development of the Aquatic Center at Zebulon

Douglas County has named Colorado Aquatics Foundation as its aquatics development partner for the Zebulon Regional Sports Complex. CAF is independently developing and fundraising for the Colorado Aquatic Center as the aquatic component envisioned for the broader complex.

The main Zebulon building is funded and moving forward. Funding for the Colorado Aquatic Center is outside that scope of work and must be raised independently by Colorado Aquatics Foundation.

View on Douglas County's Zebulon site →
The Project

Project at a Glance

Developer

Colorado Aquatics Foundation

Independently developing, funding and planning the Colorado Aquatic Center.

Location

Zebulon Regional Sports Complex

Planned as the aquatic component of the proposed complex in Douglas County.

Facility

35,000+ sq. ft.

Anchored by a 50-meter competition pool and a 25-yard instructional pool.

Phase 1 Goal

$3.2 million

CAF target: October 31, 2026.

Donate to Phase 1
County Role

Aquatics Development Partner

Douglas County has named CAF as its aquatics development partner for Zebulon.

Status

In Development

CAF is actively advancing facility planning, operating-model research, community engagement, preconstruction coordination, partnerships and fundraising.

The Need

Shared Pools, Growing Demand

Colorado Aquatic Center at Zebulon
Existing 50-meter pools
25 minute drive or less
30-40 minute drive
* 15 minute drive from CAC to I-25 and C-470* Less than 20 minute drive from CAC to E-470 and Parker Road
Public high school, no pool (10)
Private high school, no pool (4)
Public middle school, no pool (7)
USA Swimming Club Team Facility (65)
Summer Rec League Team Facility (64)

Where Demand Meets Limited Access

  • Many USA Swimming club facilities and summer league pools across the metro area fall within the regional draw of this site.
  • Those same pools are doing heavy lifting for their communities, serving clubs, school teams, lessons and everyday uses like lap swim, therapy and family recreation. Because so many programs share the same water, lane space, practice times and meet schedules are often shaped by availability rather than community need.
  • For families who need true 50 meter training, there is still no public long-course pool in the south metro, so they must travel to a handful of distant facilities.

The Colorado Aquatic Center gives those communities room to breathe, so clubs, schools, lessons, and public programs can grow side by side.

"For many Denver families, swim lessons are not easy to access. Programs fill up fast, and some families wait months for an opening."
CBS News Colorado, “Swim Lessons Are Hard To Come By In Denver, Nationwide”, June 2022
The Solution

50 Meters and 25 Yards

The Colorado Aquatic Center is planned as its own wing of the Zebulon building, with opportunities to share walls, support spaces and mechanical infrastructure with the broader facility. A 50-meter competition pool anchors the planned natatorium, with a separate 25-yard program pool alongside it.

Architectural floor plan showing the 50-meter pool, instructional pool, sport courts, and support spaces
Conceptual

Subject to change pending design, engineering, and Douglas County review.

Integrated Design, Greater Efficiency

Coordinated design creates opportunities to share walls, support spaces and mechanical infrastructure with the broader building, which may reduce costs compared with a standalone addition. Final systems and any savings depend on completed design, engineering and procurement.

A Place to Learn

The 25-Yard Pool

25-yard program pool for learn-to-swim and therapy
Illustrative

Reference photo: Idaho Central Aquatic Center, Boise, ID. Not the Colorado Aquatic Center.

For a child learning to swim. A parent looking for a safer start. An older adult rebuilding strength. A family simply looking for a place in the water. This is the everyday side of the Colorado Aquatic Center.

A Place to Belong and Compete

The 50-Meter Pool

Wide view of a 50-meter competition pool from spectator seating, with swimmers training, busy pool deck and grandstands
Illustrative

Photo: IU Indianapolis Natatorium, photographed by Colorado Aquatics Foundation during facility research. Shown as a 50-meter facility reference.

A home where swimmers can train long course without leaving the county. Where school teams can compete. Where water polo, diving and major meets have room to grow. And where a young swimmer can look down 50 meters of water and imagine what's possible.

Built for Community

A Place for All of Us.

This isn't just about building another pool.

It's about the child learning to swim. The athlete chasing a goal. The family looking for a place to belong. The adult returning to the water. The first responder preparing for the moment someone needs them.

Different reasons for walking through the doors. One place built to make room for all of them.

That's the Colorado Aquatic Center we're working to build.

Explore Our Mission →
Young swimmers together at the pool deck, arms around each other after practice
The Opportunity

Why This Construction Window Matters

Because the broader Zebulon project is funded and moving forward, with vertical construction currently anticipated around March 2027, advancing Aquatic Center design, permitting and structural-material planning during the same development window creates opportunities for coordination that may not exist later. CAF is targeting $3.2 million by October 31, 2026 so that work can advance in time to pursue coordination with the broader construction window.

Advance With the Broader Project

Moving Phase 1 forward now gives CAF the opportunity to coordinate Aquatic Center design, permitting, procurement and construction sequencing with the broader Zebulon project rather than approaching the facility later as a standalone addition.

Preserve Integration Opportunities

Advancing during the current development window creates opportunities to coordinate structural materials, shared infrastructure and mechanical planning with the broader building. Final systems and savings will depend on completed design, engineering and procurement.

Reduce the Risk of Paying More Later

Waiting could require separate mobilization, staging, redesign or retrofits, and separate design and mechanical planning could reduce opportunities to share infrastructure with the broader building. Later structural-material purchases could also lose coordinated procurement and leave the Aquatic Center more exposed to future pricing and inflation. Moving now gives CAF the best opportunity to evaluate and capture efficiencies while coordinated planning remains possible.

Confirmed

Site Work Is Underway at Zebulon

Earthmovers are shaping the Zebulon campus where the Colorado Aquatic Center is planned. This is Zebulon campus site work: construction of the Colorado Aquatic Center itself has not yet begun and depends on CAF independently advancing its funding, design and permitting.

Earthmovers grading the Zebulon construction site

Shaping the ground where the aquatic center will rise

Overlot grading across the Zebulon site

Grading across the 50-acre complex

Zebulon is moving forward. CAF's Phase 1 campaign is intended to position the independently funded Aquatic Center to advance during the same development and construction window.

The Ask

What Phase 1 Funding Moves Forward

Phase 1 moves three critical pieces of the Aquatic Center forward: design, steel acquisition and permitting.

Phase 1 Goal$3.2 Million by October 31, 2026

Architectural and Engineering Design

Advances the coordinated architectural and engineering work required to move the Aquatic Center from concept toward a permit-ready project.

Steel Acquisition

Funds planned steel acquisition while coordination with the broader Zebulon project may create procurement and sequencing opportunities.

Permitting

Supports the permitting work required to move the Aquatic Center through county review toward construction readiness.

Donate to Phase 1

Apple Pay, PayPal, Venmo, and Google Pay are one-tap express options on the payment page. To pay by credit or debit card, enter your details on the next page and click Continue.

Questions Donors Ask

These answers reflect where the project stands today, based on the county partnership, active site work, and current design plans.

Click a question to expand its answer.

Project Documentation & Research

Want to Dig Deeper?

Review public project documents, county sources and research supporting the case for the Colorado Aquatic Center.

Get Project Updates

Receive major fundraising, county-partnership, and construction milestones.

We respect your privacy. Unsubscribe anytime.

"I've spent years around this sport, first as a swim parent, then as a volunteer with USA Swimming for more than a decade, and now as part of a nonprofit with a real chance to make an impact. We've built this campaign so a gift to Phase 1 moves real work forward. Our commitment is to be outstanding stewards of every gift made, to make a difference in Douglas County and to give back to the sport that has given our families so much already."
Jerrod BrownPresident and Co-FounderColorado Aquatics Foundation
Colorado Aquatics Foundation logo

Colorado Aquatics Foundation is a 501(c)(3) nonprofit dedicated to the advancement of water safety and drowning prevention, aquatic access, and aquatic sports across Colorado. The Foundation is also developing the Colorado Aquatic Center, envisioned as part of the proposed Zebulon Regional Sports Complex in Douglas County, to facilitate this mission.

Contact

© 2026 Colorado Aquatics Foundation. 501(c)(3) nonprofit. All rights reserved.

Privacy Policy

EIN: 93-2929414